Contracts and legal documents

Every contract available before you sign

Nothing “on request”: the full wording of every contract you can conclude with us is public even before the first contact. Study the terms in advance, and no surprise awaits you at signing. We prepare and maintain the documents in cooperation with a reputable law firm, and we handle individual tailored adjustments the same way (volume agreements, SLA parameters, DPA addenda): write to peppol​@​verteco.digital and our lawyer will prepare the draft amendment.

Every document is also available as a PDF to download and print (links on each row): the PDF is always the current effective wording, identical to the page, with the address, the version and page numbers in the footer. The English PDF is an informative translation; the Slovak PDF is the binding wording. If you want a signed copy, you sign the DPA, SLA and NDA electronically in the portal (company details, Access & contracts tab; the confirmation arrives by e-mail with the PDF of the signed wording) and print the one-page service agreement signed and stamped by our managing director there. Companies served through an intermediary have their contract with that partner.

We conclude the DPA, SLA and NDA in the published wording; the [•] fields are filled in with identification details at signing. Each wording has a version number and an effective date, can be downloaded as a PDF, and on conclusion we also send it to you as a PDF attachment by e-mail, so you hold a verifiable copy of exactly the wording you accepted. We announce changes to the terms at least 30 days in advance with the right to leave without sanction; we make previous versions available on request at any time. Operational security: we are a certified provider of the Financial Administration of the Slovak Republic (EFSK000031); ISO/IEC 27001:2022 certification is under way with the accredited body SKQS, s. r. o., Žilina (SNAS accreditation), chosen in September 2026, and we plan the certificate by the end of 2026. OpenPeppol requires it from all providers in the network from 1 October 2027; for now no one has to hold it.